You are not logged in.
Hi,
When I make a project with a cost and when I then check that cost in the budgets, that project cost is not subtracted from that budget and there is nothing there about that project cost, just like it doesn't exist.
Normally I should see the costs of that project in the budget details but it doesn't appear there, that is a bug I think ??
thanks, Verus.
Offline
CentOS 6.5 - CentOS 7.x
PHP 5.6 - PHP 7.x - MySQL 5.6 - MariaDB 10.2 + APC + oOPcache
GLPI from 0.72 to dev version
Certifiée ITIL (ITV2F, ITILF, ITILOSA)
Offline
Hi,
I just installed glpi 0.85.1 and tried the same.
I have a budget for 2014 with 80 000 € and I make a project in 2014 that costs 10 000€.
Now that cost is viewable in the budget in the ITEM section (from that budget) but it is still not subtracted from the budget cost in the MAIN section (Total spent on the budget is still 0).
Is this still a bug ?
It should be substracted normally.
Thanks. V
Last edited by verus (2014-12-12 12:54:56)
Offline
Hi, is there an update for this ?
Offline
Hello, this is a bug and still unfixed.
best regards,
Verus.
Offline