You are not logged in.
Pages: 1
Hi there,
is it possible to set a limit on the bookings calendar so the user can only book the rooms/computers one or two weeks in advance ?
At the moment the full calendar for 2001 and 2012 is displayed but I want to avoid long bookings.
Thanks
Offline
Version of GLPI used ?
Where do you see a limit in calendar ? because i have no limit in my calendar for reservation.
CentOS 6.5 - CentOS 7.x
PHP 5.6 - PHP 7.x - MySQL 5.6 - MariaDB 10.2 + APC + oOPcache
GLPI from 0.72 to dev version
Certifiée ITIL (ITV2F, ITILF, ITILOSA)
Offline
Hello Yllen,
GLPI version is 0.80.2. Maybe i wasn´t clear on my post. What I want to prevent users to book Pc´s a long time in advance so I want to display only one or two weeks in the calendar instead of the whole year. How can I achieve this, is there any option in the configuration ?
Thanks.
Offline
Pages: 1